# ShiftHouse support

Use ShiftHouse to turn an approved industrial housekeeping instruction into a shift- and zone-specific task card.

On this page

## What ShiftHouse structures

ShiftHouse combines zone, shift, soil or housekeeping issue, task, frequency, responsible role, approved work instruction and a coordination note.

## Safety boundary

ShiftHouse never replaces permits, isolation, lockout/tagout, site hazard controls or accountable safety authorization.

## Handover matters

Any incomplete work, guarded hazard, blocked access or supply issue should remain visible until an accountable owner closes it.

## Approved instructions take precedence.

Approved labels, SDS, SOPs, contracts, site procedures and accountable decisions remain authoritative where applicable. If the workflow conflicts with a controlled source, stop and resolve the source issue first.

## Working steps.

1. 01
  Name the zone and shift.
2. 02
  Select the housekeeping issue.
3. 03
  Add the task, frequency and responsible role.
4. 04
  Reference the approved work instruction.
5. 05
  Review coordination and handover notes before closure.

## At a glance

A shift card connects a housekeeping task to its zone, owner and approved work instruction.

| Item | Purpose | Review |
| --- | --- | --- |
| Zone and shift | Where and when the work is planned. | Identify the working area clearly. |
| Task, frequency and role | The housekeeping issue, planned task and owner. | Use the approved local work instruction. |
| Coordination note | Access, dependencies and handover context. | Permits, isolation and safety authorisation remain separate. |

## Worked example

Name the zone and shift, identify the housekeeping issue and enter the task, approved frequency and responsible role. Add the controlled work-instruction reference and review coordination notes before handover.

## Common questions

Access is blocked or a hazard remains.

Keep the issue visible in handover and route it to the accountable site role. The card does not authorise unsafe access.

A permit or isolation is required.

Follow the site’s permit, isolation and safety controls before work. Generating a card does not satisfy those controls.